View Single Post
  #7  
Old 01-12-2006, 07:48
CNHSS1's Avatar
CNHSS1 CNHSS1 is offline
PAID MEMBER
 
Join Date: Jan 2006
Location: shrewsbury
Posts: 606
CNHSS1 is an unknown quantity at this point
Default

yep chopped the flange off, flipped the bottom mount 180degrees and becomes top mount but at the front of the block rather than rear (needs to be front to fit the scimitar chassis).
Crouchie b had them cut by a place in my home town, had three cut, £45 ea. they are stainless steel and were plasma cut, 15mm thick to allow for warping when welding and then skimmed back to 10-12mm or so.
a mate of mine Cameron has done better CAD drawings of the flange so they fit in one piece as crouchies need the runners cut in half to fit. If you want to get one done, i can get the CAD drawings off Cam and you can get one cut?
Reply With Quote